The deregulation of the electricity market has required transmission network owners to maximise efficiencies in operating and maintenance costs and to adopt initiatives to minimise capital expenditure. Upgrading of transmission lines to provide increased transfer capacity is one initiative that can provide for deferment of significant capital expenditure. This paper reviews investigations into uprating of a 110 kV double circuit tower line to a single circuit 275 kV arrangement. This arrangement gives a significant increase in the power transfer. The existing 110 kV suspension and strain tower bodies and super structures are retained, but with new cross arms fitted and existing conductors reused. The following aspects are examined in detail - ground clearance, insulated cross arms, radio interference, audible noise, electromagnetic fields, lightning performance and community issues. Even though the case studied was uprating a double circuit 110 kV tower line to single circuit 275 kV, the concept can be applied generally.
机译:电力市场的放松管制需要传输网络所有者可以最大限度地提高运营和维护成本的效率,并采取最大限度地减少资本支出的措施。传输线的升级提供增加的转移能力是一项倡议,可以提供大量资本支出。本文综述调查将110 kV双电路塔线的上调到单电路275 kV布置。这种布置可以显着增加电力传输。保留现有的110 kV悬架和应变塔体和超级结构,但用新的交叉配合,并且现有的导体重复使用。以下几个方面是详细的 - 地间隙,绝缘交叉臂,无线电干扰,可听噪声,电磁场,雷电性能和社区问题。即使所研究的情况正在上调双电路110 kV塔线到单电路275kV,也可以通常可以应用该概念。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号