首页> 外文会议>ASCE National Conference on Environmental and Pipeline Engineering >Cured-in-Place Force Main Rehabilitation at Great Lakes Naval Training Center
【24h】

Cured-in-Place Force Main Rehabilitation at Great Lakes Naval Training Center

机译:大湖海军训练中心的固化力主要康复

获取原文

摘要

At the Naval Training Center in Great Lakes, IL, the reliability and continuous operation of a 450mm (18 inch) O forcemain was of utmost importance. In February of 1998, the Navy Public Works Center was faced with two breaks in the subject 25 year old ductile iron force main piping. Not only did this threaten the Navy's continued operation of their pump station, there were also environmental concerns as the pipeline is located under a lakefront access road and is very near a recreational beach area on the shore of Lake Michigan. Using best value engineering, the Navy Public Works Center chose to mitigate their problems and provide system life extension through the use of a cured-in-place lining system designed specifically for pressurized piping systems.
机译:在大湖,IL的海军训练中心,450毫米(18英寸)的灭虫的可靠性和连续操作是至关重要的。 1998年2月,海军公共工程中心面临着25岁的延性主管25岁的两次休息。这不仅威胁到海军的泵站的持续运营,还有环境问题,因为管道位于湖边接入路下,非常靠近密歇根湖岸边的休闲海滩地区。利用最佳价值工程,海军公共工程中心选择了减轻了他们的问题,并通过使用专为加压管道系统设计的固化衬里系统来提供系统生命延伸。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号