首页> 外文会议>PCI/FHWA/FIB international symposium on high performance concrete >EVALUATION OF HIGH PERFORMANCE CONCRETE IN LOUISIANA'S FIRST HPC BRIDGE
【24h】

EVALUATION OF HIGH PERFORMANCE CONCRETE IN LOUISIANA'S FIRST HPC BRIDGE

机译:路易斯安那州第一个HPC桥高性能混凝土评价

获取原文

摘要

The Charenton Canal Bridge is a 111.3-m (365-ft) long structure made up of five 22.3-m (73-ft) spans, each incorporating five AASHTO Type III girders at 3.1-m (10-ft) spacing. High-performance concrete (HPC) with a design compressive strength of 68.9 MPa (10,000 psi) was used in the precast concrete piles and girders of the structure. Conventional strength HPC was used in the cast-in-place pile caps, approach slabs, bridge deck slab, barrier rail and wing walls. One of the five spans of this bridge was instrumented and monitored to measure and evaluate both early-age and long-term performance. In addition to the instrumentation and monitoring of the bridge superstructure, a concrete material testing program was also conducted.
机译:Charenton运河桥是111.3米(365英尺)的长结构,由五个22.3-m(73英尺)跨度组成,每个跨度都在3.1-m(10英尺)间距,每个跨度均为五个烟斗III梁。具有68.9MPa(10,000psi)的高性能混凝土(HPC)在预制混凝土桩和结构的梁上使用。常规强度HPC用于铸造桩帽,接近板,桥甲板板,屏障轨道和翼壁。这座桥的五个跨度之一被仪表,并监测衡量和评估早期性和长期性能。除了桥接桥接结构的仪器和监测外,还进行了一种混凝土材料测试程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号