首页> 外文会议>PCI/FHWA/FIB international symposium on high performance concrete >CONCRETE RAILROAD TIES REINFORCED WITH STEEL FIBERS September 25-27,2000
【24h】

CONCRETE RAILROAD TIES REINFORCED WITH STEEL FIBERS September 25-27,2000

机译:混凝土铁路钢丝钢纤维9月25日27,2000加强

获取原文

摘要

Prestressed concrete railroad ties were manufactured both without steel fibers and with a fiber content of 60 kg/m~3 (101.4 lb/yd~3 - 0.76 % by volume), and three different initial prestressing forces. Static tests showed that steel fibers increase the first crack and ultimate bending moments, increase significantly the slip force of the prestressing tendons, reduce crack width, add higher ductility to the ties and decrease the stress in the prestressing tendons. Under cyclic loading the fibers increase significantly the strength, decreasing the stress in the prestressing tendons by about 50 %.
机译:预应力的混凝土铁路在没有钢纤维的情况下制造,纤维含量为60kg / m〜3(101.4磅/ yd〜3-0.76%),以及三种不同的初始预应力。静态试验表明,钢纤维增加了第一裂缝和最终的弯曲力矩,提高了预应力肌腱的滑移力,降低裂缝宽度,为关系增添较高的延展性并降低预应力肌腱中的应力。在环状加载下,纤维的强度显着增加,将预应力肌腱中的应力降低约50%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号