首页> 外文会议>PCI/FHWA/FIB international symposium on high performance concrete >PRECAST ELEMENTS FOR SEGMENTAL BRIDGE CONSTRUCTION OF THE BANG NA EXPRESSWAY, BANGKOK
【24h】

PRECAST ELEMENTS FOR SEGMENTAL BRIDGE CONSTRUCTION OF THE BANG NA EXPRESSWAY, BANGKOK

机译:Bang Na Expressway的分段桥梁建设预制元素,曼谷

获取原文

摘要

The Bang Na Expressway is a 55 km (34 miles) long viaduct in Bangkok, Thailand. With its recent completion in March 2000, it became the longest bridge in the world. The total deck area consists of 1,900,000 m~2 (20,400,000 sq ft). The superstructure is entirely corn-posed of precast concrete segments with external post-tensioning and dry joints. The core component of the structure is the mainline segment with a wingspan of 27.2 m (89 ft). The total cost for planning, designing, constructing and financing the project was more than dollar1 billion.
机译:Bang Na Expressway是泰国曼谷的55公里(34英里)的高架桥。最近于2000年3月完成,它成为世界上最长的桥梁。总甲板区域由1,900,000 m〜2(20,400,000平方英尺)组成。上部结构完全玉米玉米覆盖具有外部后张紧和干接头的预制混凝土段。该结构的核心部件是主线段,其翼展为27.2米(89英尺)。规划,设计,建设和融资项目的总成本超过10亿美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号