Remediation of a Manufactured Gas Plant Site in Los Angeles, California

机译:修复加利福尼亚州洛杉矶制造的天然气厂部位

获取原文

摘要

The following is a summary of the total volumes removed during the remedial activities: 1. Impacted Soil: 40,602 tons 2. Wastewater: 72,385 gallons 3. Drilling Mud: 153 tons (60-inch pipeline removal) 4. Piping: Approximately 3,000 lineal feet 5. Concrete, brick, and asphalt: Approximately 140 loads. In spite of the constant changing aspects of the project, careful planning and a proactive decisions, kept the project moving forward to a successful completion . The project was completed without any incidents or any formal complaints from neighboring businesses. The final removal action completion report was approved by DTSC in March, 2000.
机译:以下是在补救活动期间删除总量的总量:1。撞击土壤:40,602吨2.废水:72,385加仑3.钻井泥:153吨(60英寸管道移除)4。管道:约3,000英尺5.混凝土,砖和沥青:约140负载。尽管项目的不断变化的方面,但仔细的规划和主动决策,使项目继续前进到成功完成。该项目未经邻国业务的任何事件或任何正式投诉完成。最终删除行动完成报告于2000年3月由DTSC批准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号