North Dorchester and Reserved Channel CSO tunnels―Boston, Massachusetts

机译:北多切斯特和保留信道Cso Tunnels-Boston,Massachusetts

获取原文

摘要

The North Dorchester Bay and Reserved Channel CSO Consolidation conduits are being constructed for the Massachusetts Water Resources Authority, along with the Reserved Channel Pumping facility to provide the conveyance and pumping capacity to enable the permanent closure of eight combined sewer outflow into the North Dorchester Bay within the Boston Harbor and sufficient capacity to convey flows currently tributary to the Reserved Channel from three CSO outfalls under a 2 year, 24-hour storm. The CSO conduits will be a minimum of 13-foot diameter tunnels constructed in soft ground consisting of mostly glacial outwash sands and gravel and glacial marine clays, primarily Boston Blue Clay. This almost $100 million tunnel project will be constructed using a pressurized face tunnel boring machine and pre-cast concrete segmental gasketed, bolted linings. The proximity of the Atlantic Ocean and the presence of man-made hydrocarbon pollutants from neighboring petroleum storage facilities present the need to limit drawdown and water infiltration quantities. The North Dorchester Bay CSO Tunnel will be approximately 13,000-feet long with tunnel crown depth varying from 25 to 55 below ground surface. The 2,600-foot long Reserved Channel conduit will be the same diameter to allow use of a common machine and will be approximately the same depth below ground surface. Connections between the existing CSO outfalls and the new tunnels are made through drop-shafts. The dropshafts will be a truncated helicoidial-ramp type to minimize need for deaeration chambers and long connecting pipe between the tunnels and dropshafts. Tunnels will be constructed from large diameter construction shafts. The upstream ends of the Bay and Channel tunnels will terminate into large-diameter, multi-use access shafts which will be large enough to allow removal of the tunneling machine, and will also function as permanent inspection and maintenance points and provide air venting and odor control during exhaust of air during tunnel filling in a storm event.
机译:北多彻斯特湾和保留信道CSO整合导管正在为马萨诸塞水资源管理机构建造,以及保留的通道泵设施,提供传送和泵送能力,使八个组合的下水道流入北多彻斯特湾内的永久关闭波士顿港和足够的能力传达目前支流的流量,从三个CSO排出量下的保留渠道,2年间暴风雨。 CSO导管将是在软土中构建的最小13英尺直径的隧道,这些隧道组成,包括冰川冲洗砂和砾石和冰川海洋粘土,主要是波士顿蓝粘土。这一近1亿美元的隧道项目将采用加压面隧道镗床和预浇筑的混凝土节段垫圈,螺栓衬里构建。大西洋的附近以及来自邻近石油存储设施的人造碳氢化合物污染物的存在呈现了限制下降和水渗透量的需要。北多彻斯特湾CSO隧道将大约13,000英尺长,隧道冠深度从地面下方的25到55变化。 2,600英尺长的保留通道导管将具有相同的直径,以允许使用公共机器并且在地面下方大致相同的深度。现有的CSO排出与新隧道之间的连接是通过滴轴制造的。落叶轴将是截短的螺旋斜面型,以最小化沟槽和下落轴之间的脱气室和长连接管的需要。隧道将由大直径结构轴构成。海湾和通道隧道的上游端将终止成大直径,多用途接入轴,这将足够大以允许移除隧道机,并且还将用作永久性检查和维护点并提供通风和气味在隧道填充风暴事件中的空气中的排气期间控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号