首页> 外文会议>North American tuneling : conference and exhibition >Prediction of final displacement of tunnel section during excavation
【24h】

Prediction of final displacement of tunnel section during excavation

机译:挖掘过程中隧道部分最终位移的预测

获取原文

摘要

Certain points on tunnel section start to displace before measurements begin. Therefore prediction of final displacement tunnel section during excavation should be consist of these unmeasured and measured displacements. This paper is focused on methods to estimate the unmeasured displacements and to predict the total final displacements using measurement data in early stage of excavation. An exponential function and linear function are used to find out unmeasured displacements and final displacements are predicted according to total displacements at a distance of one tunnel diameter from the working face.
机译:隧道部分的某些点开始在测量开始之前取代。因此,在挖掘过程中最终位移隧道部分的预测应由这些未测量和测量的位移组成。本文的重点是估计未测量的位移的方法,并在挖掘早期使用测量数据预测使用测量数据的总最终位移。指数函数和线性函数用于找出未测量的位移,并且根据从工作面的一个隧道直径的距离处的总位移来预测最终位移。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号