【24h】

Coalbed Methane Development in the Gunnedah Basin, New South Wales Australia

机译:Gunnedah盆地的煤层气开发,新南威尔士州澳大利亚

获取原文

摘要

PEL 238 covers approximately 9,500 square kilometres of the Permo-Triassic Gunnedaha Basin, NSW in which independently assessed natural gas resources have been calculated at over 35TCF within the Permian coal measures of PEL 238 with additional significant gas resources identified within Permian and Triassic sandstone reservoirs. 15 wells, 484 kilometres new seismic data, two cavity completions and 7 hydraulic fracture stimulations have been completed during hte period March, 1998 to February, 1999. Selected coal seam methane wells have been placed in production and although many wells are producing gas they are still in the initial production stage.
机译:PEL 238涵盖大约9,500平方公里的PERPO-Triassic Gunnedaha盆地,NSW,其中在PEL 238的PELIA煤措施中,在PEEL 238的二维煤措施中计算了独立评估的天然气资源,其中包括在二叠纪和三叠纪砂岩水库内识别的额外显着的气体资源。 15井,484公里的新地震数据,1998年3月至1999年3月的HTE期间,两腔完工和7个液压断裂刺激完成。选定的煤层甲烷井已被置于生产中,虽然许多井正在生产气体仍然在初始生产阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号