首页> 外文会议>Longwall USA international exhibition conference >Experience of Longwall Face Support Selection at RAG American Coal Company
【24h】

Experience of Longwall Face Support Selection at RAG American Coal Company

机译:RAG美国煤炭公司Longwall面部支持选择的体验

获取原文

摘要

At longwall faces, a hydraulic powered roof support with insufficient capacity often results in excessive roof convergence and thus roof failure or falls, or its structure damage under intensive roof activity; and an improperly designed support configuration may create roof control problems in the unsupported area between the canopy tip and the faceline due to a great tip-to-face distance or floor control problems due to the high toe pressure on the mine floor. However, a heavier-than-required roof support can dramatically increases its cost. Therefore, the selection of longwall face supports for a specific mining and roof condition is technically and economically critical for mine operations. The experience obtained from the RACC's (RAG American Coal Co.) longwall operations shows that a properly selected or designed roof support can not only provide a better roof control, but also has less maintenance work and a longer service life. The process of selecting longwall face supports for a specific mine site at RACC involves the following procedures: 1. Determination of the roof load demand on a face support, 2. Analysis of the resultant force on a face support, and 3. Selection of longwall face supports. At RAG American Coal Company, three methods have been used to determine the roof load demand on a face support. They are the Roof Shear Angle, Beam, and Neural Network methods. This paper tries to explain each method in detail and summarize our findings in the process of longwall face support selection.
机译:在Longwall面部,液压动力屋顶支撑容量不足,通常会​​导致过度的屋顶收敛,从而导致屋顶故障或下降,或其在密集屋顶活动下的结构损坏;并且,由于矿地板上的高脚压压力,因此由于矿地板上的高脚压导致的尖端面距离或地板控制问题,而设计的不正当的支撑配置可以在冠层尖端和面部之间产生屋顶控制问题。然而,较重的屋顶支撑率可以显着提高其成本。因此,对于特定采矿和屋顶状况的长壁面支撑件的选择在技术上和经济地对矿井操作至关重要。 The experience obtained from the RACC's (RAG American Coal Co.) longwall operations shows that a properly selected or designed roof support can not only provide a better roof control, but also has less maintenance work and a longer service life.在RACC中选择特定矿山站点的LongWALL面部支架的过程涉及以下步骤:1。在面部支撑的情况下确定屋顶负荷需求,2。对面部支撑的合成力分析,3.选择长壁面部支持。在RAG美国煤炭公司,已经使用三种方法来确定面部支架上的屋顶负荷需求。它们是屋顶剪切角,光束和神经网络方法。本文试图详细解释每种方法,并在长墙面支持选择过程中总结我们的研究结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号