Communications infrastructure and substation automation communications planning issues

机译:通信基础设施与变电站自动化通信规划问题

获取原文

摘要

Summary form only given. This presentation highlights the findings from the several communications topics studied in a survey conducted by Newton-Evans Research Co. Chuck Newton's first and second quarter 2000 worldwide utility research program on the topic of substation automation trends includes more than 125 utilities of the world, with more than 35 of the top 100 electric utilities. Issues to be covered include: choices among substation protocols-within the substation and from the substation to external host or network; substation data to be reported back to master locations; primary substation information processing task handler selection; external links to the substation of today; choice of physical links between IEDs in the substation; physical links from the substation; and communications architecture within the substation and to/from the substation.
机译:摘要表格仅给出。本演示文稿突出了牛顿 - 埃文斯研究公司Chuck Newton的第一个和2000年第二季度的一项调查中研究的几个通信主题的调查结果,全球实用程序研究计划的变电站自动化趋势的主题包括125多个公用事业,超过35个电力公用设施。要涵盖的问题包括:变电站协议之间的选择 - 在变电站内和从变电站到外部主机或网络;将要报告给主位置的变电站数据;初级变电站信息处理任务处理程序选择;外部链接到今天的变电站;在变电站中的IED之间的物理链接选择;来自变电站的物理链接;和变电站内的通信架构和来自变电站的架构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号