首页> 外文会议>North American tunneling >Optimization of tunnel pre-support-Softground NATM at Washingon, D.C. Metro's section F6b
【24h】

Optimization of tunnel pre-support-Softground NATM at Washingon, D.C. Metro's section F6b

机译:Washington的隧道预支持 - 软隧道优化D.C. Metro的F6B部分

获取原文
获取外文期刊封面目录资料

摘要

Section F6b includes the construction of Congress Heights Station using cut and cover techniques and two 460 m long. single track tunnels that are the focus of this paper. The New Austrian Tunneling Method (NATM) was selected for tunnel construction because of (1) short length of tunnels, (2) short mobilization, and (3) the capability to mine from multiple headings. NATM tunneling started in October 1996 and the "hole through" in the IB tunnel was made in September 1997.
机译:F6B部分包括使用切割和覆盖技术和两台460米长的国会高度站的构造。单个轨道隧道是本文的重点。新的奥地利隧道方法(NATM)被选中用于隧道结构,因为(1)短的隧道长度,(2)短暂动员,和(3)从多个标题的能力。 Natm Tunneling于1996年10月开始,1997年9月制造了IB隧道中的“洞”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号