首页> 外文会议>International symposium on safety on science and technology >Safety monitoring combined with numerical study in the excavation of large scaled underground opening complex
【24h】

Safety monitoring combined with numerical study in the excavation of large scaled underground opening complex

机译:安全监测结合大规模地下开放复合体开挖数值研究

获取原文

摘要

From the life protection and long-run point of view, safety science and technology are the most important considerations in the construction, as well as in the running period, of the underground powerhouse. In this paper, the application of monitoring combined with numerical analysis in the safety excavation of large scaled hydropower underground opening complex is introduced. The safety monitoring system of the underground powerhouse complex and the typical geological condition, as well as the excavation and supporting process are described, and key points to the safety and stability of the powerhouse surrounding rock mass are mentioned. The general considerations and results of the numerical study are used as the references for the construction of the Ertan hydropower plant underground powerhouse.
机译:从生命保护和长期的角度来看,安全科学和技术是建设中最重要的考虑因素,以及地下厂房的运行期。本文介绍了监测在大型水电站地下开口复合体中的安全开挖中的应用相结合的应用。描述了地下功率厂的安全监测系统及典型的地质条件,以及挖掘和支撑过程,提及围岩岩体围绕岩体的安全性和稳定性的关键点。数值研究的一般注意事项和结果用作建设ertan水电站地下厂房的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号