A transformational approach applied to outage management of nuclear power plants

机译:一种转型方法,适用于核电站中断管理

获取原文

摘要

We report on a successful project for transference of advanced planning and scheduling technology for outage management, a collaboration between Rome Laboratory, the Electrical Power Research Institute, Kaman Science, and Kestrel Institute, as part of DOD's dual use program. The main goal of the project was to evaluate the use of transformational approaches and AI technology to solve real world planning and scheduling problems involving complex constraints. ROMAN (Rome Lab Outage Manager) is the prototype system that was developed as a result of this project. ROMAN's main innovation compared to the current state of the art outage management tools is its integrated approach to outage management automatically enforcing safety constraints during the planning and scheduling phase. Another innovative aspect of ROMAN is its generation of more robust schedules that are feasible over time windows. In other words, ROMAN generates a family of schedules by assigning time intervals as start times to activities rather than single point start times, without affecting the overall duration of the project.
机译:我们报告了中断管理进步和调度技术转移的成功项目,罗马实验室,电力研究所,Kaman Science和Kestrel Institute之间的合作,作为国防部的双重使用计划的一部分。该项目的主要目标是评估转型方法和AI技术的使用,解决涉及复杂约束的现实世界规划和调度问题。罗马(罗马实验室中断经理)是由于该项目而开发的原型系统。罗马的主要创新与现有的现场中断管理工具相比是其在规划和调度阶段在规划和调度阶段中自动执行安全约束的综合方法。罗马的另一个创新方面是它产生更强大的时间表,这些时间表会随着时间的推移是可行的。换句话说,罗马通过将时间间隔作为开始时间分配给活动而不是单点开始时间来生成一系列计划,而不会影响项目的整体持续时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号