首页> 外文会议>IEE Seminar on Eastern European Nuclear Power Plant Standards >IC upgrade measures for VVER model V213 units in the Czech Republic, Hungary and Slovakia
【24h】

IC upgrade measures for VVER model V213 units in the Czech Republic, Hungary and Slovakia

机译:捷克共和国,匈牙利和斯洛伐克的VVER型号V213单位的I&C升级措施

获取原文

摘要

NNC have been involved in the first two phases of PHARE project EC/ENE15 for the upgrade of the I&C on three VVER model V213 nuclear power plants in the Czech Republic, Hungary and Slovakia. The terms of reference for this work were: to establish the technical and other reasons for replacement of the I&C; to develop an outline design intent, programme and budget cost; to prepare the technical specifications for the upgraded I&C systems; and to prepare other documents to support the enquiry process for the I&C upgrade. This paper draws on the work undertaken by NNC, briefly describing the plants, their operational history, the reasons for upgrading and the upgrades initiated to date. It then considers some of the constraints and technical difficulties, decisions to be taken and preparatory work required for the early stages of implementation.
机译:NNC已经参与了Phare Project EC / ENE15的前两个阶段,以便在捷克共和国,匈牙利和斯洛伐克的三维Vver型号V213核电站升级I&C。这项工作的职权范围是:建立更换I&C的技术和其他原因;开发大纲设计意图,计划和预算成本;为升级的I&C系统准备技术规范;并准备其他文件以支持I&C升级的查询流程。本文借鉴了NNC开展的工作,简要描述了植物,其运营历史,升级原因和迄今为止启动的升级。然后,它考虑了一些限制和技术困难,要采取的决定和实施早期实施所需的准备工作。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号