首页> 外文会议>ASME Pressure Vessels and Piping Conference >EVALUATION OF THE FAILURE OF A RADIOACTIVE WASTE TRANSFER LINE JACKET
【24h】

EVALUATION OF THE FAILURE OF A RADIOACTIVE WASTE TRANSFER LINE JACKET

机译:放射性废物传输线夹克失效评估

获取原文

摘要

Radioactive wastes are confined in 49 underground storage tanks at the Savannah River Site. The waste is transported between tanks primarily via an underground transfer piping system. Due to the hazardous nature of the waste, the inner core stainless steel pipe is typically surrounded by a carbon steel pipe jacket, which provides secondary containment. Recently, several through-wall penetrations were discovered on a segment of one of the jackets. An evaluation was performed to verify the failure mechanism and to estimate the degree of damage that existed on the pipe segment. Failure analysis confirmed that pitting corrosion on the exterior of the pipe led to the through-wall penetration. Ultrasonic measurements were utilized to determine the remaining wall thickness in adjacent areas of the pipe. Based on these measurements, the degree of pitting and general corrosion was determined. Pit growth rate models were then developed to estimate the life expectancy of sections of the pipe that had not been excavated. The calculations indicated that the occurrence of through-wall penetrations in this jacket will begin to increase substantially in 12 years. Given that this pipe segment will be utilized beyond this time, short-term and long-term solutions to this failure were proposed. The short-term solutions focused on the repair or replace decisions that must be made to return the jacket to service as soon as practical. The long-term solutions focused on a broader strategy to address jacket integrity issues in the entire waste storage facility. These solutions included the evaluation of innovative remote inspection and repair techniques.
机译:放射性废物仅限于萨凡纳河网站的49个地下储罐。废物主要通过地下转移管道系统在罐之间运输。由于废物的危险性,内芯不锈钢管通常由碳钢管夹套包围,这提供二次容纳。最近,在其中一件夹克的一段上发现了几个穿透渗透。进行评估以验证故障机制,并估计管道区段上存在的损坏程度。故障分析证实,管道外部的蚀腐蚀导致通壁穿透。利用超声测量来确定管道相邻区域中的剩余壁厚。基于这些测量,确定了蚀的程度和一般腐蚀。然后开发了坑生长速率模型来估计管道部分的预期寿命,这是尚未被挖掘的管道。该计算表明,这件夹克中穿过墙面穿透的发生将在12年内开始增加。鉴于该管道区段将超出此时间,提出了对此故障的短期和长期解决方案。短期解决方案专注于维修或更换决定,必须尽快将夹克退回服务。长期解决方案专注于更广泛的策略来解决整个废物存储设施中的夹克完整性问题。这些解决方案包括评估创新的远程检查和修复技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号