Stabilization of a sliding rockfill embankment

机译:滑动堆石路堤的稳定

获取原文
获取原文并翻译 | 示例

摘要

A rockfill embankment formed by end tipping limestone and granite rock into a tailings pond was observed to be sliding along it's base during and after the raising of fill and during the driving of steel piles behind the rockfill embankment. In view of continued sliding movements at one part of the rockfill compaction grouting of base of rockfill was carried out to stabilize the embankment. The compaction grouting successfully arrested the movements but large deflections occurred during the grouting process resulting in lateral deflection of the piles.
机译:观察到在填土抬高期间和之后以及在堆石路堤后面的钢桩打入过程中,将石灰石和花岗岩岩石端部倾斜到尾矿池中形成的堆石路堤沿其底部滑动。鉴于堆石料的一部分持续滑动,对堆石料的基础进行了灌浆以稳定路堤。压实灌浆成功地阻止了运动,但在灌浆过程中发生了大的挠度,导致桩的横向挠度。

著录项

  • 来源
    《》|1999年|p.367-370|共4页
  • 会议地点 Seoul(KP)
  • 作者

    C.T.Toh; S.K.Chee; K.K.Hyurk;

  • 作者单位

    Dr C.T.Toh Consultant, Kuala Lumpur, Malaysia;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 自然地理学;
  • 关键词

  • 入库时间 2022-08-26 14:18:26

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号