首页> 外文会议>Power Industry Computer Application Conference >Cost justification of the new Ohio Edison Company's energy management system
【24h】

Cost justification of the new Ohio Edison Company's energy management system

机译:新俄亥俄州爱迪生公司能源管理系统的成本良好理由

获取原文

摘要

A systematic method for analyzing alternative strategies that the Ohio Edison (OE) Company used during the feasibility study of its energy management system (EMS) is discussed. A key element in the requirements study of an EMS is determining the value of not only the present system, but also of several feasible alternatives in terms of present worth dollars. The term value represents the difference between a system's benefits (or the loss of those benefits) and its cost. When the values of various alternatives are compared over time with that of the existing system, the most cost-effective point for system replacement can be accurately defined along with the best alternative.
机译:讨论了分析俄亥俄州爱迪生(OE)公司在其能源管理系统(EMS)可行性研究期间使用的俄亥俄州爱迪生(OE)公司的替代策略的系统方法。 EMS的要求研究中的一个关键因素是确定不仅是目前系统的价值,还可以在目前价值的数量方面确定几种可行的替代品。术语值代表系统的福利(或这些福利损失)之间的差异及其成本。当随着现有系统的时间比较各种替代方案的值时,可以用最佳替代方案准确地定义系统更换的最具成本效益的点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号