This paper investigates the overvoltage due to different types of switching in Nam Theun 2 - Roi Et 2 500 kV network. The study is based on PSCAD/EMTDC performed for a guide line for 500 kV operations in Lao PDR. The appropriate representation for the various components such as transformer, transmission line, circuit breaker, surge arrestor and shunt reactor, have been selected. The study covers two most severe cases: line energization and re-energization due to single phase to ground and three phases to ground faults, and switching under different load conditions is considered. In the series of simulations, the maximum overvoltage is determined. The maximum switching overvoltage (SOV) from light load and three phases to ground fault are quite high. The efficiency of line terminal 444 kV surge arresters to controlled SOV along the 500 kV lines is clearly demonstrated.
机译:本文调查了由于NAM Theun 2 - ROI ET 2 500 KV网络中不同类型的切换而导致的过电压。该研究基于为老挝PDR的500 kV操作进行了PSCAD / EMTDC。已经选择了各种组件的适当表示,例如变压器,传输线,断路器,浪涌雷管和分流式反应器。该研究涵盖了两种最严重的情况:由于单相到地,线通电和再通电,以及接地故障的三个阶段,并考虑在不同负载条件下切换。在一系列模拟中,确定最大过电压。从轻负载和三个阶段到接地故障的最大切换过电压(SOV)非常高。清楚地证明了线终端444kV浪涌避雷器以控制SOV的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号