首页> 外文会议>Conference on Observatory Operations: Strategies, Processes, and Systems >Quality interaction between mission assurance and project team members (Practice for Mission Assurance and other Operations Projects)
【24h】

Quality interaction between mission assurance and project team members (Practice for Mission Assurance and other Operations Projects)

机译:特派团保证与项目团队成员之间的质量互动(特派团保证和其他运营项目的实践)

获取原文

摘要

Mission Assurance's independent assessments started during the SPITZER development cycle and continued through post-launch operations. During the operations phase, the health and safety of the observatory is of utmost importance. Therefore, Mission Assurance must ensure requirements compliance and focus on the process improvements required across the operational systems, including new/modified products, tools, and procedures. To avoid problem reoccurrences, an interactive model involving three areas was deployed: Team Member Interaction, Root Cause Analysis Practices, and Risk Assessment. In applying this model, a metric-based measurement process was found to have the most significant benefit. Considering a combination of root cause analysis and risk approaches allows project engineers to the ability to prioritize and quantify their corrective actions based on a well-defined set of root cause definitions (i.e., closure criteria for problem reports), success criteria, and risk rating definitions.
机译:特派团保证在Spitzer开发周期开始的独立评估,并通过发布后运营继续进行。在运营阶段,天文台的健康和安全至关重要。因此,任务保证必须确保要求合规性,并专注于运营系统所需的过程改进,包括新/修改的产品,工具和程序。为避免遇到问题再兴,部署了涉及三个区域的互动模型:团队成员互动,根本原因分析实践和风险评估。在应用此模型时,发现基于度量的测量过程具有最显着的益处。考虑到根本原因分析和风险方法的组合允许项目工程师能够基于一系列明确定义的根本原因定义(即问题报告的闭幕标准),成功标准和风险评级来优先考虑和量化其纠正措施的能力定义。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号