首页> 外文会议>Conference on Electrical Machines, Drives and Power Systems >Water Storage Electric Power Plant with Controllable Suction Head
【24h】

Water Storage Electric Power Plant with Controllable Suction Head

机译:储水电力厂与可控抽吸头

获取原文

摘要

Pump Storage Hydro Power Plants are a universal and competitive source of electric energy and of ancillary services for Electric Power Markets. However, inherent problems are encountered during their operation. The process of acceleration of a motor-pump unit from standstill to rated speed provokes shock loading both for the unit's parts and for the electric power system. After switching on the motor-pump unit is loaded at fool load, which is practically not controllable during the operation, i.e. the motor is responsive neither to the changes in frequency nor to the occurrence of congestions and contingencies. In order to avoid these deficiencies, special devices are required. This paper describes a new approach for mitigation of the start-up process and increasing efficiency, reliability and responsibility of ternary pump storage units. The essence of the suggestion is a complementary, third sleeve added to known hydraulic scheme of a pump storage power plant. This third sleeve is a conduit comprising a spherical valve and one or a set of ejectors installed into the suction tube between the pump impeller and the shut-off valve/gate of the suction conduit. The description includes the main functions and embodiments of suggested new constructive parts disclosed, as well as the main advantages and disadvantages of the advancements. The analysis of these advantages and disadvantages is a future scientific challenge that will enable assessment of the economic potential of the proposed novel plant.
机译:泵储存水电站是一种普遍竞争的电能和电力市场的辅助服务。但是,在操作期间遇到固有的问题。从静止到额定速度的电动泵单元加速的过程激发了单位部件和电力系统的冲击负载。在接通电动机泵单元之后,在傻瓜负载下装载,在操作期间实际上是不可控制的,即,电动机既不响应频率的变化也不达到拥塞和突发事件的发生。为了避免这些缺陷,需要特殊的设备。本文介绍了三元泵存储单元的启动过程和提高效率,可靠性和责任的新方法。建议的本质是一种互补的第三套筒,添加到泵蓄能电厂的已知水力方案。该第三套筒是包括球形阀的导管和一个或一组喷射器,其安装在泵叶轮和抽吸导管的截止阀/闸门之间的吸管中。该描述包括所公开的建议新的建设性部件的主要功能和实施例,以及前进的主要优点和缺点。对这些优点和缺点的分析是未来的科学挑战,这将能够评估拟议的新型工厂的经济潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号