首页> 外文会议>Symposium on Piezoelectricity, Acoustic Waves, and Device Applications >Analysis on the pull strength's calculation method during the construction of oil pipeline directional drilling crossing the yellow river and improvement
【24h】

Analysis on the pull strength's calculation method during the construction of oil pipeline directional drilling crossing the yellow river and improvement

机译:黄河交流越过油水管道方向钻探施工过程中的拉力计算方法分析

获取原文
获取外文期刊封面目录资料

摘要

This paper reviewed the methods, which calculate the pull strength during directional drilling crossing construction of oil pipeline, both at home and aboard. And based on the analysis of these methods, the detailed research was given. At the same time, considering the peculiarity of this channel geologic structure and the technological requirements, the method, averaged standard method and unloading arch method, was given to calculate the maximal pull strength. It is practiced that, this method is instructive and meaningful to the directional drilling crossing construction.
机译:本文综述了该方法,该方法计算了在家庭和船上的路上钻井横穿建设期间的拉力。 并根据这些方法的分析,给出了详细的研究。 同时,考虑到这种通道地质结构的特殊性以及技术要求,提供了方法,平均标准方法和卸载拱法,以计算最大拉强强度。 它实践了,这种方法对方向钻孔交叉结构具有有意义的和有意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号