首页> 外文会议>IABSE symposium on tomorrow s megastructures >Sydney Metro Cable Stayed Bridge, a Meeting of Precast Segmental Concrete and Cable Stayed Construction Technology
【24h】

Sydney Metro Cable Stayed Bridge, a Meeting of Precast Segmental Concrete and Cable Stayed Construction Technology

机译:悉尼地铁电缆停留桥,预制节段混凝土和电缆延时施工技术会议

获取原文

摘要

Sydney Metro's expansion into the north west of the city has recently included the construction of 4.5 km of elevated viaduct that includes a one of kind cable rail bridge. Set out on a 403 m horizontal radius with a 130 m long main span, the bridge's prestressed precast concrete segmental deck is supported by a single plane of cables. An integral part of the design challenge was the need to construct the bridge using the same overhead gantry used to construct the simply support spans on the main viaduct. Using the gantry, the three span structure was first built as a continuous girder supported on the four permanent supports with five temporary supports. The deck sections were erected as a series of cantilevers, then connected into a continuous girder and finally, after the release of the temporary supports, converted into a cable supported structure. A feature of the design was the staging of the deck prestressing that avoided removing strand installed during a previous stage as the bridge metamorphized from a seven-span structure to a three-span structure.
机译:悉尼地铁在城市西部的扩张最近包括建造4.5公里的高架桥,包括一种电缆轨道桥之一。在一个403米的水平半径上载入130米的主跨度,桥梁预应力的预制混凝土节段由一块电缆支撑。设计挑战的一个组成部分是需要使用相同的架空龙头构造桥梁,用于构造在主要高架桥上的简单支持跨度。使用龙门架,三个跨度结构首先是由四个永久性支持的连续梁构建,具有五个临时支持。将甲板部分竖立为一系列悬臂,然后连接到连续梁中,最后,在释放临时支撑后,转换成电缆支撑的结构。该设计的特征是甲板预应力的分段,避免在前一级安装的股线作为从七跨结构到三跨结构的桥梁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号