XFEL AMTF operation completed: results and lessons learned

机译:XFEL AMTF操作完成:结果和经验教训

获取原文

摘要

In order to produce short pulsed electron beam of 17.5 GeV energy, the XFEL linear accelerator is being built at DESY in Hamburg. Before being installed in the accelerator tunnel, 103 accelerator modules have to be tested in Accelerator Module Test Facility (AMTF). Cavities and cryomodules are tested at two vertical cryostats and three horizontal test benches. Two valve boxes and a liquid helium (LHe) storage tank are installed to enable cryogenic operation of AMTF. This paper describes our experience of three years cryogenic operation of AMTF. All 800 cavities and almost all cryomodules have been tested. The test results and lessons learned are also summarized
机译:为了产生17.5 GEV能量的短脉冲电子束,XFEL线性加速器正在汉堡中的斯瓦格建造。 在安装在加速器隧道中,必须在Accelerator模块测试设施(AMTF)中测试103个加速器模块。 在两个垂直低温恒温器和三个水平测试台上测试空腔和冷冻组。 安装两个阀箱和液氦(LHE)储罐,以使AMTF的低温操作能够实现。 本文介绍了我们三年的AMTF通道操作的经验。 所有800个腔和几乎所有冷冻模块都已进行了测试。 还概述了测试结果和经验教训

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号