首页> 外文会议>International Conference on Quality in Research >Utilization of idle power plant for own use and excess power in an oil-and-gas company
【24h】

Utilization of idle power plant for own use and excess power in an oil-and-gas company

机译:利用怠速发电厂自身用途和油气公司的多余动力

获取原文
获取外文期刊封面目录资料

摘要

The Indonesian government (GoI) applies the cost recovery concept in the upstream sector of the oil and gas resources. It postulates the expenses spent by the contractor during exploration and exploitation activities will be settled through production sharing scheme. The cost includes the compensation for the production equipment and utilities, not to mention the power generator. When the oil-and-gas exploitation declines or even shut-in due to technical and economic reasons, some of them become idle assets. In this study, we investigate the utilization of the idle 2 × 750 kVA gas engine power generators for a new gas facilities project in different region. As the newly facilities require a smaller power supply (2 × 350 kVA) than the power plant capacity, the excess power is proposed to be sold to the electric utility. Here, an economic analysis is carried out to compare between purchasing new power generators and the utilization of the idle ones. The result shows that the utilization of idle asset provides economic benefit both for the GoI and the contractor. This scheme will solve the electricity need for own use and the excess power may be transferred to the electric utility, realized by power purchase agreement.
机译:印度尼西亚政府(GOI)在石油和天然气资源的上游部门采用成本回收概念。它假设承包商在勘探期间花费的费用,并通过生产分享计划解决了开发活动。该成本包括生产设备和公用事业的补偿,更不用说发电机。由于技术和经济原因,石油和气体剥削跌幅下降甚至关闭,其中一些人成为空闲资产。在这项研究中,我们研究了在不同区域的新型气体设施项目的空闲2×750 kVA燃气发电机的利用。由于新设施需要较小的电源(2×350 kVA)而不是电厂容量,因此提出了多余的功率以销售给电力效用。这里,进行了经济分析,以比较购买新发电机与空闲的利用率之间的比较。结果表明,空闲资产的利用为GOI和承包商提供了经济效益。该方案将解决自行使用的电力需求,并且可以将多余的功率转移到电效用,由电力购买协议实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号