首页> 外文会议>SME annual meeting >FINDING ADDED VALUE AT NEWMONT THROUGH LARGE-SCALE MINING SEQUENCE, CUTOFF GRADE AND PROCESS OPTIMIZATION USING MIXED INTEGER LINEAR PROGRAMMING
【24h】

FINDING ADDED VALUE AT NEWMONT THROUGH LARGE-SCALE MINING SEQUENCE, CUTOFF GRADE AND PROCESS OPTIMIZATION USING MIXED INTEGER LINEAR PROGRAMMING

机译:通过使用混合整数线性规划,通过大型挖掘序列,截止等级和过程优化在Newmont上找到附加值

获取原文

摘要

Through the systematic application of mine schedule optimization tools Newmont is identifying added value at its operations. The current state-of-the-art tools, however, lack the specific features needed at its more complex project's to optimize infrastructure size, mining and/or processing rates and cutoff grades. Ultimately the objective of these tools is to assess the optimal scale of a project and provide operating guidance for its mines.
机译:通过系统的应用程序应用程序,优化工具NewMont正在识别其操作中的附加值。然而,目前的最先进的工具缺乏在其更复杂的项目中所需的特定功能,以优化基础设施大小,采矿和/或处理速率和截止等级。最终,这些工具的目的是评估项目的最佳规模,并为其矿山提供操作指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号