首页> 外文会议>IABSE Symposium on Engineering for Progress, Nature and People >Puente Nigale Main Bridges: Long Span Precast Segmental Cable Stayed Bridges for Railway and Roadway
【24h】

Puente Nigale Main Bridges: Long Span Precast Segmental Cable Stayed Bridges for Railway and Roadway

机译:Puente Nigale主桥:长跨度预制节段电缆停留的铁路和巷道桥梁

获取原文

摘要

The existing bridge across the Lake Maracaibo, the General Rafael Urdaneta Bridge, dates from the 1960s and is now operating at full capacity. Construction of the second fixed link across the Lake Maracaibo, the Puente Nigale, started in 2012. The new link will carry two railway tracks and four lanes of highway. The total length is around 11 km from coast to coast and consists of 10 km approach bridges and two parallel 910 m cable stayed bridges with 430 m main span across the navigation channel in precast segmental construction. This will be world record span for a concrete cable stayed bridge carrying railway traffic. This paper gives an overall presentation of the project and describes the cable stayed main bridges with special focus on the unique features, including precast segmental superstructure, central cable plane and train/bridge dynamics.
机译:横跨Maracaibo湖的现有桥梁,一般的Rafael Urdaneta Bridge,历史可追溯到20世纪60年代,现在正在全部运营。在Maracaibo Lake Maracaibo,Puente Nigale的第二个固定联系的建设于2012年。新的链接将携带两条铁路轨道和四条公路车道。总长度距离海岸约11公里,由10公里的接近桥梁和两个平行的910米电缆停留桥,在预制节段结构中,带有430米的主跨度。这将是世界纪录跨度,用于携带铁路交通的混凝土缆车座桥。本文介绍了该项目的整体演示,并描述了电缆停留的主桥,专注于独特的功能,包括预制节段上层建筑,中央电缆平面和火车/桥接动力学。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号