Chilina Bridge over the Chili River in Arequipa. Balanced cantilever segmental bridge in high seismicity area

机译:在辣椒河的奇利纳桥在阿雷基帕。高地震区的平衡悬臂节段桥

获取原文

摘要

Chilina Bridge is a 562 long prestressed concrete viaduct with two 11.3 m wide decks in the city of Arequipa (Peru) with span scheme: 100+157+142+102+61 m. Free Cantilever Method construction is used. High seismicity in the area reaches Peak Ground Acceleration of 0.6 g and involves special analysis and detailing. The new bridge will become the largest urban bridge in Peru when completed. Construction started in March 2013 and will be finished by the end of 2014. Seismic analysis is done according to AASHTO specifications for a 1000 year return period Earthquake. Seismic displacement demands are as high as 90 cm and 45 cm in transverse and longitudinal direction.
机译:奇利娜桥是一款562长的预应力混凝土高架桥,拥有两座11.3米宽甲板,在阿雷基皮市(秘鲁),跨度方案:100 + 157 + 142 + 102 + 61米。使用免费悬臂法结构。该地区的高地震性达到0.6克的峰值接地加速度,涉及特殊分析和细节。完成后,新桥将成为秘鲁最大的城市桥梁。建设于2013年3月开始,将于2014年底完成。地震分析根据AASHTO规范进行了1000年的回报期地震。地震位移需求高达90厘米,横向和纵向方向高达45厘米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号