Analysis of Quarterly Production Scheduling Using Ore Blending Strategy Case Study Pit 7A and 15 Block a Tayan Bauxite Mine, PT ANT AM (Persero) Tbk.

机译:使用矿石混合策略案例研究坑7A分析季度生产调度塔铝铝土(Perero)TBK泰安铝土矿矿。

获取原文

摘要

Tayan Bauxite Mine is one of the mining projects in West Kalimantan developed by Antam. Overall amount of resource owned by this mine is 50.25 million wmt of washed bauxite (WBx). In block A, total WBx resource contained is 26.75 million wmt, with average grade of 48.14% Al_2O_3 and 3.23% R-SiO_2. Starting from 2014, this mine will be projected to supply Chemical Grade Alumina (CGA) plant. To fulfill the needs of plant, 850,000 wmt of WBx supply is required annually, with minimum 46% Al_2O_3 and maximum 3.6% R-SiO_2. This tonnage is approximately equivalent to 1,700,000 tonnes of crude bauxite (CBx) mined from the mine front. Based on block model data, pit limit 7A and 15 are carried out to determine the potencies of both pits to meet production target. From pit 7A, 1,655,428 wmt of WBx can be obtained, with average grade of 50.05% Al_2O_3 and 2.35% R-SiO_2. While from pit 15, there are 872,646 wmt of WBx, with average grade of 38.40% Al_2O_3 and 6.35% R-SiO_2. Then, quarterly production scheduling is carried out to produce the mine boundary for each quarter, which is used as guidance in mining operation. After mining and washing process, stockpile management and ore blending strategy are carried out so that the plant target can be achieved. From the ore blending strategy result, the average tonnage ratio obtained of pit 7A to pit 15 is 2.31 :1. By using the ore blending strategy, Antam can apply conservation by optimizing marginal grade reserve so it can be fully utilized.
机译:Tayan Bauxite Mine是由安德坦开发的西加里曼丹的矿业项目之一。该矿山拥有的总资源总额为5025万只洗涤铝土矿(WBX)。在A块A中,包含的总WBX资源为2675万WMT,平均等级为48.14%Al_2O_3和3.23%R-SiO_2。从2014年开始,这个矿井将被预计提供化学级氧化铝(CGA)植物。为了满足植物的需求,每年需要85万WBX供应,最小46%AL_2O_3和最大3.6%R-SIO_2。这种吨位大约相当于从矿前面开采的1,700,000吨的原油铝土矿(CBX)。基于块模型数据,进行坑极限7a和15,以确定两个凹坑满足生产目标的恒部。从凹坑7A,可以获得1,655,428WMT的WBX,平均50.05%Al_2O_3和2.35%R-SiO_2。虽然从坑15开始,WBX的872,646wmt,平均级别为38.40%Al_2O_3和6.35%R-SiO_2。然后,进行季度生产调度以生产每个季度的矿井边界,该矿区被用作采矿操作的指导。在采矿和洗涤过程之后,进行储存管理和矿石混合策略,以便可以实现植物目标。从矿石混合策略结果,凹坑7A与坑15获得的平均吨位比为2.31:1。通过使用矿石混合策略,安径可以通过优化边缘级储备来施加节约,因此它可以充分利用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号