Reducing the Cost of Tunnel Design in Australia

机译:降低澳大利亚隧道设计成本

获取原文

摘要

The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to documenting 'for construction'. On recent projects the post-tender stages have been variously called 30 per cent - 70 per cent -100 per cent; or concept-substantial-final; or system definition-preliminary-critical. The design is reviewed at each stage by the designer's internal reviewer, the contractor and its independent advisor(s), the owner and its independent advisor(s), the project's independent certifier, proof engineers and often third-party stakeholders and their advisors. Documentation for each stage often dominates the design effort, at times distracting from design. This paper presents the authors' experience of this design-and-review process. Comparisons of design budget and actual design spend and design program implications are presented. It is postulated that a subtle change has occurred in our industry that has diminished the value of the design dollar. Is there a better process? An alternative is suggested.
机译:从其概念到其施工的澳大利亚的设计和构建隧道项目的开发需要在记录“建设”之前的几个不同阶段的设计和审查设计。在最近的项目上,招标后的阶段有各种称为30% - 70%-100%;或概念 - 大量决赛;或系统定义 - 初步关键。该设计由设计师的内部审稿人,承包商及其独立顾问,业主及其独立顾问,该项目的独立顾问,该项目的独立认证机构,校验工程师和往往是第三方利益相关者及其顾问的每个阶段进行审核。每个阶段的文档经常主导设计努力,有时会分散设计。本文介绍了作者对这一设计和审查过程的经验。展示了设计预算与实际设计的比较和设计方案影响。它假设我们的行业发生了微妙的变化,这减少了设计美元的价值。有更好的过程吗?建议替代方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号