首页> 外文会议>Australasian Tunnelling Conference >Ambuklao Tunnel Plug Construction
【24h】

Ambuklao Tunnel Plug Construction

机译:Ambuklao隧道插头施工

获取原文

摘要

The Ambuklao and Binga Rehabilitation Project is a 175 MW hydro power project currently under construction across dual sites in the north region of Luzon Island, Philippines. When it was built in 1956, the Ambuklao Dam harnessed the second largest hydro-electric reservoir in Asia. However, due to landslide erosion and prolonged silt infiltration caused by an earthquake in 1990, the power plant has been rendered inoperable since 1999.
机译:Ambuklao和Binga Rehabilitation Project是一个175兆瓦的水电工程,目前正在菲律宾吕宋岛北部地区的双地施工。 当它建于1956年时,Ambuklao大坝利用了亚洲第二大水库。 然而,由于1990年地震引起的滑坡侵蚀和延长的淤泥渗透,从1999年以来,发电厂已经变得无法操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号