首页> 外文会议>POWID Symposium >DIABLO CANYON POWER PLANT INSIGHTS FROM APPLICATION OF USNRC INTERIM STAFF GUIDANCE
【24h】

DIABLO CANYON POWER PLANT INSIGHTS FROM APPLICATION OF USNRC INTERIM STAFF GUIDANCE

机译:UsnRC临时工作人员指导应用的暗黑破坏神峡谷电厂见解

获取原文

摘要

Diablo Canyon Power Plant (DCPP) is replacing the existing digital Westinghouse Eagle 21 Process Protection System (PPS) to address obsolescence and maintenance issues. The Eagle 21 system was installed in 1994 to replace the original analog Westinghouse Hagan 7100 PPS. The Nuclear Regulatory Commission (NRC) has designated the License Amendment Request (LAR) for the DCPP PPS replacement project as the pilot application for use of Digital I&C (DI&C) Interim Staff Guidance (ISG)-06, Licensing Process. ISG-06 describes the licensing process guidance the NRC staff may use to review the LAR for a DI&C modification. This paper describes PG&E participation in ISG-06 development along with the process used to prepare the LAR, which is currently under Staff review. USNRC Digital I&C (DI&C) Interim Staff Guidance (ISG) document ISG-02 describes acceptable methods for implementing diversity and defense-in-depth (D3) in digital I&C reactor protection system designs to mitigate the potential for a common-cause failure (CCF) that would disable redundant protection system channels and prevent FSARU Chapter 15 acceptance criteria from being met. The USNRC has approved the Topical Report for the PPS Replacement D3 design, which conforms to the guidance of ISG-02 Positions 1 & 2 without a Diverse Actuation System (DAS) by providing automated, independent, and diverse backup. This paper describes PG&E participation in the ISG-02 development process as well as the evolution of the PPS replacement D3 design.
机译:暗暗峡谷发电厂(DCPP)正在取代现有的数字西屋Eagle 21流程保护系统(PPS)以解决过时和维护问题。 Eagle 21系统于1994年安装,以取代原来的模拟Westinghouse Hagan 7100 PPS。核监管委员会(NRC)已指定为DCPP PPS替换项目的许可修订请求(LAR)作为使用数字I&C(DI&C)临时工作人员指导(ISG)-06,许可流程的使用申请。 ISG-06介绍了许可流程指导,NRC员工可以用于审查DI&C修改的LAR。本文介绍了PG&E参与ISG-06的开发以及用于准备LAR的过程,目前正在员工审查。 USNRC Digital I&C(DI&C)临时工作人员指导(ISG)文件ISG-02描述了在数字I&C反应堆保护系统设计中实施多样性和防御(D3)的可接受方法,以减轻常见导致失败的可能性(CCF )将禁用冗余保护系统通道并防止FSARU第15章接受标准从达到。 USNRC已批准了PPS更换D3设计的局部报告,它通过提供自动化,独立和多样化的备份,符合ISG-02位置1和2的指导。本文介绍了PG&E参与ISG-02开发过程以及PPS更换D3设计的演变。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号