Fortis BC owns and/or operates five hydroelectric facilities with dams on the Kootenay River downstream of the Kootenay Lake: the Corra Linn, Upper Bonnington, Lower Bonnington, South Slocan, and Brilliant Hydroelectric Projects. An analysis was undertaken to determine the extent of potential inundation that may result in the event of a dam failure at the Corra Linn Hydroelectric Project, which is the most upstream facility of the five. The study was completed using the dam breach component of HEC-RAS with the HEC-GeoRAS interface used to transfer modelled water surface elevations to ESRI ArcGIS. Two failure scenarios were examined in this study: failure due to a Probable Maximum Flood (PMF) event, and failure due to a Maximum Design Earthquake (MDE) event. It was assumed that failure of the Corra Linn Dam would be associated with the failure of all of the Kootenay River dams downstream. In the PMF case each dam was failed successively as the peak flood wave reached it; in the earthquake case all dams failed simultaneously. Inundation maps that show peak water surface elevations were prepared for all areas downstream of the Corra Linn Dam on the Kootenay River and all areas along the Columbia River from the Hugh Keenleyside Dam down to the Canada/US Border. The model results indicate that some residential areas along the Kootenay and Columbia Rivers may be inundated in the event of failure of the Corra Linn Dam. The results from this study can be used to update Emergency Preparedness Plans and to determine the Dam Safety Consequence Category for the Corra Linn Dam.
机译:Fortis BC拥有和/或在Kootenay Lake下游的Kootenay River上拥有五大水力设施:Corra Linn,Upper Bonnington,较低的Bonnington,South Slocan和辉煌的水电项目。进行了分析,以确定可能导致CORRA LINN水电项目的坝体失败的潜在洪水的程度,这是五个最上游设施。使用HEC-RA的DAM漏洞组件与用于将建模的水面升高转移到ESRI ArcGIS的HEC-Georas接口完成了该研究。在本研究中检查了两个故障情景:由于最大的最大洪水(PMF)事件而导致的故障,并且由于最大设计地震(MDE)事件而失败。假设Corla Linn Dam的失败将与下游所有Kootenay河流的失败相关联。在PMF案例中,随着峰值泛波达到的,每个大坝都失败了;在地震案例中,所有水坝都同时失败。在KooteNay河上的Corra Linn Dam下游的所有区域和欧洲河沿岸的所有区域都准备了显示峰水表面升高的淹没地图,从休群岛大坝到加拿大/美国边境。模型结果表明,在Corra Linn大坝失败的情况下,沿着KooteNay和哥伦比亚河流的一些住宅区可能被淹没。本研究的结果可用于更新紧急准备计划并确定Corla Linn大坝的大坝安全后果类别。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号