首页> 外文会议>Water Environment Federation annual technical exhibition and conference >MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM
【24h】

MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM

机译:迎接为未来提供可靠供水的挑战,地下水补水系统

获取原文

摘要

The Groundwater Replenishment (GWR) System is an innovative approach to keeping Orange County’s groundwater basin a reliable source for meeting the region's future potable water needs. A joint program of the Orange County Water District (OCWD) and the Orange County Sanitation District (OCSD), the GWR System is an ambitious, large-scale project that will construct an advanced recycled water treatment facility (AWTF) to treat secondary wastewater for reuse. The facility will replace the aging Water Factory 21 (WF21) which, when completed in 1976, was one of the first recycled water treatment plants in the world. Using microfiltration as pretreatment for reverse osmosis (RO) and ultraviolet radiation (UV), Phase 1 of the GWR System will produce 70 million gallons per day (mgd) of recycled water that will meet all drinking water standards. The treated water will be injected into the ground by OCWD through new and existing injection wells to supply the local seawater intrusion barrier and pumped 13 miles up the Santa Ana River to be percolated into spreading basins for groundwater recharge, improving the groundwater quality and reducing Southern California’s dependence on imported water. The facility will produce enough water to supply the needs of over 200,000 families. While OCWD will construct and operate the GWR System, the project will have far reaching impacts and benefits on OCSD as well as OCWD. OCSD is committed to good resource management and has partnered with OCWD over the years on numerous recycled water projects, including WF21 and more recently, the Green Acres Project (GAP). Participation of OCSD in the GWR System is defined in a new inter-agency operating agreement between OCSD and OCWD which, among other things, stipulates a 50/50 cost share of capital costs between the OCSD and OCWD. OCSD staff participates as active members in the GWR System design team and has helped shape favorable public perception for the project at a time when they were also gaining public input regarding the future of their ocean discharge waiver. Despite all of the additional responsibilities, there are significant benefits to OCSD, including deference or elimination of an additional ocean outfall, and support for OCSD's long-standing commitment to water reclamation.
机译:地下水补货(GWR)系统是一种创新的方法,使橙县地下水盆地保持可靠的来源,以满足该地区未来的饮用水需求。 GWR系统是一个橙县水区(OCWD)和橙县卫生区(OCSD)的联合计划,是一个雄心勃勃的大型项目,将建设先进的再生水处理设施(AWTF)来治疗二级废水重用。该设施将取代21(WF21)的老化水厂21(WF21),该工厂于1976年完成时,是世界上第一家循环水处理厂之一。使用微滤作为反渗透(RO)和紫外线辐射(UV)的预处理,GWR系统的第1阶段将产生每天7000万加仑(MGD)的再循环水,其将满足所有饮用水标准。经处理的水将通过OCWD通过新的和现有的注射井注入地面,以供应当地海水入侵屏障,并将13英里的Santa Ana River泵送到用于地下水充电的扩散盆地,从而改善地下水质量和减少南部的地下水加利福尼亚依赖进口水。该设施将生产足够的水来提供超过20万个家庭的需求。虽然OCWD将构建和操作GWR系统,但该项目将对OCSD以及OCWD进行深远达到影响和益处。 OCSD致力于良好的资源管理,多年来与OCWD合作,在众多回收水项目,包括WF21,最近,绿色亩的项目(GAP)。 OCSD在GWR系统中的参与是在OCSD和OCWD之间的新机构间运营协议中定义,其中包括在OCSD和OCWD之间的资本成本50/50成本份额。 OCSD工作人员在GWR系统设计团队中作为积极成员参与,并在当时还增加了对其海洋卸货的未来的公共投入时,对该项目有所高兴的公众感知。尽管所有额外的责任,OCSD都有显着的益处,包括尊重或消除额外的海洋排污,以及支持OCSD对水填海的长期承诺。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号