首页> 外文会议>Water Environment Federation annual technical exhibition and conference >Corralling Cowtown?: Comprehensive CIP Development for one of the Nation’s Fastest Growing Large Cities
【24h】

Corralling Cowtown?: Comprehensive CIP Development for one of the Nation’s Fastest Growing Large Cities

机译:Corralling Cowtown?:全面的CIP开发,为全国发展最快的大城市

获取原文

摘要

The City of Fort Worth, faced with one of the fastest growth rates of all large cities in the nation, has recently completed a dynamic, comprehensive wastewater system capital improvement plan to facilitate significant growth in Fort Worth’s service area and a projected doubling of population from 740,000 to 1.5 million people over the next twenty five years as shown in Figure 1. Fort Worth grew at a rate of approximately 3.5% annually from 2000 to 2010 which, according to Census records, places it in the top two fastest growing large cities in the nation. Developing a wastewater system capital improvement plan for a large city with this tremendous growth rate facilitates a number of challenges such as regional growth and adequate capacity in wastewater collection and treatment facilities, focusing on the maintenance and rehabilitation of existing infrastructure, improving system reliability, as well as, maintaining superior wholesale and retail customer service. This paper discusses some of the innovative tools used in the development of the wastewater system master plan faced with these challenges. These tools include the development of a strategic plan, utilization of GIS throughout the wastewater flow projections, modeling and rehabilitation assessment, development of a risk based asset management approach to score and prioritize needed capital improvements for critical facilities (Figure 2), extension of the wastewater collection system model through the major primary components of the treatment plant facilities for an integrated modeling evaluation, assessment and implementation of various new treatment strategies such as the development of new regional treatment facilities and peak flow storage to optimize treatment capacity, and a number of enhanced business processes to make the wastewater model sustainable to other data sources, such as GIS, CMMS and the condition database, as shown in Figure 3. Special focus was given to have a balanced integrated approach of providing long term capacity while also implementing a number of new programs to improve system operation and enhance wastewater system rehabilitation/replacement measures as shown in Figure 4.
机译:堡垒城市面临着全国所有大城市的最快增长率之一,最近完成了一种充满活力的,全面的废水系统资本改进计划,以促进沃斯特价值的服务区大量增长和从中预计的人口翻倍未来二十五年的740,000人,如图1.沃思堡从2000年至2010年以每年约3.5%的速度增长,这是普查记录,将其放在最快的大城市中的两大最快的大城市国家。开发一个具有这种巨大增长率的大城市的废水系统资本改进计划有助于一些挑战,如区域增长和充分的污水收集和治疗设施能力,重点是现有基础设施的维护和恢复,提高系统可靠性,如以及维护优越的批发和零售客户服务。本文讨论了一些用于开发污水系统主计划的一些创新工具,面临这些挑战。这些工具包括开发战略计划,在整个废水流程中利用GIS,建模和康复评估,基于风险的资产管理方法的开发得分,并优先考虑所需资本改进的关键设施(图2),延伸废水收集系统模型通过处理厂家的主要组成部分,为综合建模评估,评估和实施各种新的治疗策略,如开发新的区域治疗设施和峰流储存,优化治疗能力,以及许多增强的业务流程使废水模型可持续到其他数据源,如GIS,CMMS和条件数据库,如图3所示。特别焦点具有提供长期容量的平衡综合方法,同时也实现了一个数字改善系统运行的新计划ANCE废水系统康复/更换措施如图4所示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号