首页> 外文会议>Annual conference of the Canadian Nuclear Society >Mobile Tritium Removal Facility - An Affordable Option?
【24h】

Mobile Tritium Removal Facility - An Affordable Option?

机译:移动氚拆除设施 - 实惠的选择?

获取原文

摘要

Tritium removal facilities are only likely to be an issue when CANDU plants have matured and the increasing tritium levels in the water have become intolerable from a personnel health physics perspective. Even then some station owners claim that a Tritium removal facility is unnecessary, because improved health physics performance and practices is all that is required to protect against possible personnel exposure. To support this argument it is also true to say that the tritium accumulation does stabilize, and will reach a stage where the tritium content will no longer increase. However for station owners that support the view that they follow an ALARA principle in which only the lowest level achievable is acceptable, a tritium extraction plant when the plant is new or one built later when the plant is operating and in mid life, both have arguments to support the expense. For a CANDU reactor in mid-life, there are two options for siting the Tritium Removal Facility (TRF). 1. Stationary Option which will require permanent structures for each station. 2. Mobile Option which considers a complete TRF that can be moved from station to station In most existing CANDU-6 stations, no provisions have been made to construct and operate a TRF. This would make the Stationary Option costly because space would have to be provided and newly added infrastructure would have to be installed. With appropriate seismic qualification and following the necessary codes and standards, a Mobile TRF unit could be more cost effective, particularly if there were a possibility to share the unit with other stations in like position.
机译:当Candu植物已经成熟并且水中增加的氚水平从人员卫生理理学的角度来看,氚删除设施才有可能成为一个问题。即使那么一些车站所有者声称,不需要氚的去除设施,因为改善了健康物理性能和实践,以防止可能的人员暴露所需的全部。为了支持这一论点,也真正地说氚积聚确实稳定,并将达到氚内容不再增加的阶段。然而,对于支持该观点的车站所有者,他们遵循Alara原则,其中只有可获得的最低级别是可接受的,当工厂是新的或者在植物运营和中期寿命时的一个内部建造的氚提取工厂支持费用。对于中生中的蜡烛反应堆,有两种选择用于选址氚移除设施(TRF)。 1.静止的选项需要每个站的永久性结构。 2.考虑完整TRF的移动期权可以在大多数现有CANDU-6站中从站移动到站,没有规定构建和操作TRF。这将使静止选择成本高昂,因为必须提供空间,并且必须安装新添加的基础架构。通过适当的地震资质和遵循必要的代码和标准,移动TRF单元可能更具成本效益,特别是如果有可能与类似地位与其他站的单位共用单位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号