首页> 外文会议>International Universities' Power Engineering Conference >A Methodology for Risk Based Asset Replacement and Investment Planning
【24h】

A Methodology for Risk Based Asset Replacement and Investment Planning

机译:基于风险的资产替代和投资计划的方法

获取原文

摘要

In the power and energy sector, Distribution Network Operators (DNOs) manage high volumes of assets of various types. The non-load related investment required to maintain a satisfactory quality of supply and service reliability can be substantial. To make effective asset management decisions affecting future investment in asset renewal to maintain a consistent and satisfactory health and risk profile across the network asset base, the condition of the asset base must be assessed. This requires future trajectories of asset health and risk with and without intervention to be estimated. Health and subsequent risk assessment is required of individual assets and populations of assets of varying demographic. The level of current and predicted risk (including financial, environmental, health and safety and the network risks) must be evaluated and compared over different asset types, of varying age, life expectancy, condition, criticality, duty, etc. combining available qualitative and quantitative condition data/information varying in volume, quality, reliability, consistency, coverage and availability.
机译:在电力和能源部门,分销网络运营商(DNOS)管理各种类型的高量资产。保持令人满意的供应和服务可靠性所需的非负载相关的投资可能是很大的。为有效的资产管理决策,影响资产更新的未来投资,以维持网络资产基础的一致和令人满意的健康和风险概况,必须评估资产基础的状况。这需要估计资产健康和危险的未来轨迹,并无才能进行干预。各个资产和各种资产所需的健康和随后的风险评估。必须在不同的资产类型,不同年龄,寿命,条件,关键性,职责等方面进行评估,并比较当前和预测的风险(包括财务,环境,健康和安全和网络风险)的水平,并在不同的年龄,预期寿命,条件,职责等。结合可用的定性和定量条件数据/信息变化体积,质量,可靠性,一致性,覆盖率和可用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号