首页> 外文会议>International Universities' Power Engineering Conference >Implementation of Free Governor Action in Power Plant to Increase System Resilience of Jawa Bali Power System Network
【24h】

Implementation of Free Governor Action in Power Plant to Increase System Resilience of Jawa Bali Power System Network

机译:电力工厂的自由州州行动的实施,以提高Jawa Bali电力系统网络的系统恢复力

获取原文

摘要

Indonesia consists of many isolated power system networks. Jawa Bali power system is the main power system networks in Indonesia. It represents 80% of total Indonesia load and consists of various types of generator units. More than 50% of the generation come from coal steam. Due to acceleration project, in the next couple years the contribution of coal steam will increase up to 75%. In term of customer, there are significant numbers of industrial customer come from steel furnished industry. Their contribution is up to 20% of total load. The loading fluctuation of those customers, mixed with other customer loading characteristic, and slow reaction of coal steam power plant may cause instability of system frequency. In 2009, there are more than 200 times frequency excursions only caused by load fluctuation and the system resilience only about 2.86% or equivalent with 500 MW/Hz. This paper will explain about processes in implementing free governor action of power plant in Jawa Bali power system start from September 2009 until now and the impact to the system resilience of Jawa Bali power system. This paper will start with theoretical background of primary control in generator, including international standard for speed droop and dead band of unit generator and followed by historical background of the situation in the system. There will be explanation of the steps in implementing free governor action in all power plants, including coordination meeting, working group creation, site visit, individual test, simultaneously test and activation, and monitoring of free governor status in each power plant. Furthermore, constraints faced by the team will be covered as well. The impact of implementation of free governor action during normal and big disturbance is described comprehensively, including comparison with the similar situation before the implementation. Finally, this paper will tell about lesson learned in implementing free governor action of power plants in Jawa Bali p- - ower system.
机译:印度尼西亚由许多隔离电力系统网络组成。 Jawa Bali Power System是印度尼西亚的主要电力系统网络。它占印度尼西亚总负载的80%,包括各种类型的发电机单元。超过50%的一代来自煤蒸汽。由于加速项目,在接下来的几年里,煤蒸汽的贡献将增加高达75%。在客户的期限中,有大量的工业客户来自钢铁装备的行业。它们的贡献占总载荷的20%。这些客户的负载波动,与其他客户装载特性混合,煤蒸汽发电厂缓慢反应可能导致系统频率的不稳定性。 2009年,仅由负载波动引起的频率偏移超过200倍,系统弹性仅约为2.86%或等效,具有500 MW / Hz。本文将于2009年9月从2009年9月开始实施Jawa Bali Power系统的自由州工厂行动的流程,并对Jawa Bali电力系统的系统恢复力的影响。本文将从发电机中的主要控制理论背景开始,包括单位发电机的速度下垂和止区频段的国际标准,然后是系统中情况的历史背景。将解释在所有电厂实施自由州长行动的步骤,包括协调会议,工作组创建,网站访问,个人测试,同时测试和激活,以及监测每个电厂的自由调速器状态。此外,团队面临的约束也将被涵盖。全面描述了在正常和大扰动期间实施自由调控器行动的影响,包括与实施前的类似情况的比较。最后,本文将讲述在Jawa Bali P-oWer系统中的自由州州州动力厂行动方面了解的课程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号