首页> 外文会议>American Society of Mechanical Engineers Annual North American Waste to Energy Conference >BEHIND THE SCENES: SNEAK PEAK AT PROCUREMENT OF INNOVATIVE RECYCLING AND WASTE-TO-FUEL CONVERSION SYSTEM EXPECTED TO YIELD 80 DIVERSION
【24h】

BEHIND THE SCENES: SNEAK PEAK AT PROCUREMENT OF INNOVATIVE RECYCLING AND WASTE-TO-FUEL CONVERSION SYSTEM EXPECTED TO YIELD 80 DIVERSION

机译:在幕后:采购创新回收和废弃对燃料转换系统的采购时潜行峰值,预计将产生80%的转移

获取原文

摘要

New Hanover County, NC, hired Gershman, Brickner & Bratton, Inc. (GBB) to help prepare a Request for Proposals (RFP) for the management and long-term operations of the County's solid waste disposal facilities, which include a secure landfill with more than 40 years of remaining life, a 20+ year old waste-to-energy (WTE) plant, and seven recycling drop-off sites receiving over 200,000 tons per year. The RFP requested a single-service provider to provide all of the services currently being undertaken by the County under a single contract going forward. During the course of the procurement, GBB's Project Manager made three presentations to the New Hanover County Board of Commissioners (County Board), advancing the RFP process from eight vendor proposals, to interviews of five firms and performing a technical and economic review of each, to short-listing two firms, to the final recommendation of going forward with high-tech start-up R3 Environmental LLC (R3). In September 2010, the County Board signed a landmark contract with R3 for the management of the County's waste system that was intended to position the County as a world leader in innovative disposal, according to County officials. Under the agreement, R3 was to implement a modern Municipal Solid Waste (MSW) processing facility pulling out recyclables and making a low-ash, high-BTU Refused-Derived Fuel (RDF) biomass product, refurbishing the current mass-burn WTE facility into an RDF biomass- fired system, and implementing a new construction waste and demolition debris recycling (C&D) processing system. The new solid waste sorting facility, with advanced machinery, dubbed a "Smart MRF," was expected to be in operation in two years, extracting recyclables and converting the organic waste stream into fuel. R3 guaranteed to divert over 80% of the incoming solid waste from the landfill. This paper provides a unique behind-the-scenes look at the procurement process used to select this "innovative technology proposal" from R3 as it pertained to recycling potential, carbon credits and renewable energy credits, and significant long-term cost benefits to the County. It will also provide a review of the vendor evaluation process that led to this landmark contract, from the RFP preparation, proposals evaluation, technical/economic reviews, short-listing, recommendations, and technical contract negotiation.
机译:New Hanover County,NC,聘请Gershman,Brickner&Bratton,Inc。(GBB),为县固体废物处理设施的管理和长期运营提供准备提案(RFP),包括安全垃圾填埋场超过40年的剩余生命,一个20多年的垃圾到能源(WTE)植物,以及每年收到200,000多吨以上的七个回收的下车网站。 RFP要求单一服务提供商提供目前由该县在未来的单一合同下进行的所有服务。在采购过程中,GBB的项目经理向新汉诺威县专员委员会(县董事会)提出了三个介绍,推动了八家供应商提案的RFP进程,为五家公司进行了采访,并对每个公司进行技术和经济审查,向两家公司短期上市,以高科技启动R3环境LLC(R3)前进的最终建议。据县官员称,2010年9月,县委员会与R3签署了与R3的地标合同,旨在将该县作为创新处置的世界领导者的垃圾制度。根据该协议,R3是实施现代城市固体废物(MSW)加工设施,拉出可回收物品并制造低灰,高BTU拒绝衍生的燃料(RDF)生物质产品,翻新当前质量燃烧的WTE设施进入一个RDF生物测量系统,并实施新的建筑垃圾和拆除碎片回收(C&D)加工系统。具有先进机械的新型固体废物分选设施被称为“智能MRF”,预计将在两年内运行,提取可回收物品并将有机废物流转化为燃料。 R3保证从垃圾填埋场转移超过80%的进入固体废物。本文提供了一个独特的幕后观看采购过程,用于从R3中选择这种“创新技术提案”,因为它与回收潜力,碳信用和可再生能源信贷有关,以及对该县的显着长期成本福利。它还将提供对来自RFP准备,提案评估,技术/经济审查,简短上市,建议和技术合同谈判的供应商评估程序的审查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号