首页> 外文会议>African regional conference on soil mechanics and geotechnical engineering >Piezocone Investigation of Paleo River Channels at Changane River, Mozambique, for a Railway Embankment
【24h】

Piezocone Investigation of Paleo River Channels at Changane River, Mozambique, for a Railway Embankment

机译:古河渠道的压电盘调查,莫桑比克,铁路堤防

获取原文

摘要

Development of a heavy minerals mine al Chibulo, Mozambique, required the construction of a railway embankment across the Changane River, a tributary of the l.impopo. The embankment will be about 5.5 kms long and between 4m and 6m high. The investigation, at the bankable feasibility stage, comprised boreholes at three bridge crossings and piezocone testing across the flood plain. These revealed four distinct paleo channels with depth of up to 30m infilled with recent alluvial deposits. Analysis of the piezocone data, from which compressibility and consolidation parameters were derived, showed that an average embankment settlement of about 1.5m will take place with a maximum of 3m. lime for consolidation will vary from a couple of years up to many decades. The proposed solution is a combination of preloading, surcharging and in the worst cases and at bridges, the addition of vertical sand drains. These together will reduce the post-construction settlements to less than 250mm over a decade; differential settlements over short distances will be negligible hence the situation will be manageable despite the extremely poor subsoil conditions.
机译:莫桑比克矿山Al Chibulo的矿山矿山矿山的开发,要求在昌纳河上建造一个铁路堤防,这是L.Impopo的支流。堤坝长约5.5公里,高4米至6米。在不可行的可行性阶段,调查包括三个桥梁交叉口的钻孔,并在洪泛平原上测试。这些揭示了四种不同的古渠道,深度高达30米,近近期的冲积沉积物。推导压阻和固结参数的压电节数据分析,表明,最大3M的平均路堤沉降约为1.5米。整合的石灰将从几十年的几年内各不相同。所提出的解决方案是预载,收费和最坏情况下的组合,在最坏的情况下以及桥梁,垂直砂排水管的添加。这些共同将减少建设后的定居点在十年上不到250毫米;尽管存在极差的底层条件,但情况将可以忽略不计,因此差别距离可以忽略不计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号