首页> 外文会议>Pipeline Pigging and Integrity Management Conference >Construction and early service defects - one operator's experience
【24h】

Construction and early service defects - one operator's experience

机译:建筑和早期服务缺陷 - 一个运营商的经验

获取原文
获取外文期刊封面目录资料

摘要

A COMMON CONCEPT of reliability engineering is that failure rates are high at both the be ginning and end of an asset's useable life. Despite this, the primary focus of most integrity management programs is aging assets, even for those companies building new infrastructure. After running hundreds of deformation tools at the construction phase and metal loss tools in the early life of assets, Access Midstream (ACMP) has concluded that inspection for construction related and early life defects is just as important as assessing for traditional threats to aging pipelines. For midstream operators who are experiencing unprecedented organic growth, these types of threats may be the single greatest threat to their operations.
机译:可靠性工程的常见概念是,在资产使用寿命的含量和结束时,故障率都很高。 尽管如此,即使为那些建立新基础设施的公司,大多数诚信管理计划的主要焦点也是老化资产。 在资产早期施工阶段和金属损耗工具处运行数百个变形工具后,访问中游(ACMP)已得出结论,建筑相关和早期寿命的检验同样重要的是评估传统威胁对老化管道的威胁。 对于正在经历前所未有的有机增长的中频运营商,这些类型的威胁可能是对其运营的最大威胁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号