【24h】

Headway generation with ROBERTO

机译:罗伯托的前锋

获取原文

摘要

A traditional and expensive solution for bottlenecks in a railway network is to build more infrastructure. To handle future growth of passenger and freight transport demand, the Dutch rail infra manager ProRail is looking for alternative ways to solve capacity and quality bottlenecks. One of the ideas is to evaluate and improve the timetable development process. By applying design principles and by other conditions, buffer times are used in different timetable construction phases. It is not clear whether and where the use of buffer times may cause a double claim on capacity. An important design principle is the use of headway times to separate two trains in the timetable safely. The specific values for headway situations are mostly unknown. Planners use general values, based on their experience. The current timetable planning tools require headway times as input data. Given the large number of potential train combinations, it is almost impossible to know every headway time before timetable construction starts. To improve the knowledge and application of headway times, ProRail started the development of ROBERTO, a tool for generating a large number of headway times. The aim is to compute headway times for specific situations and to determine general headway times for use on a more global level. The input for ROBERTO is generated by simulating train characteristics, block section occupation times and signalling aspects. ROBERTO combines possible conflicting train pairs and calculates the headway times. All results are fed into the planning systems and the effect on capacity and quality will be evaluated.
机译:铁路网络中的瓶颈的传统和昂贵的解决方案是建立更多的基础设施。为了处理乘客和货运需求的未来增长,荷兰铁路境内经理ProRail正在寻找解决能力和质量瓶颈的替代方式。其中一个想法是评估和改进时间表发展过程。通过应用设计原理和其他条件,缓冲时间用于不同的时间表施工阶段。目前尚不清楚是否使用缓冲时间的使用可能导致容量的双重索赔。一个重要的设计原则是使用令人安全的时间来分离两列火车在时间表中。入路情况的特定值大多是未知的。规划者根据他们的经验使用一般价值观。当前的时间表规划工具需要令人深入的次数作为输入数据。鉴于大量潜在的火车组合,几乎不可能在时间表施工开始前一次的时间。为了提高令人脚踏时间的知识和应用,ProRail开始开发Roberto,这是一种用于产生大量前进时间的工具。目的是计算特定情况的始终时间,并确定更多全球级别的一般入头时间。通过模拟列车特性,块部分占用时间和信令方面来生成Roberto的输入。 Roberto将可能的冲突列车对结合起来并计算令人震惊的时间。所有结果均已进入规划系统,并将评估对能力和质量的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号