首页> 外文会议>Institute of Nuclear Materials Management >Preparations for Additional Protocol Implementation at Oak Ridge National Laboratory
【24h】

Preparations for Additional Protocol Implementation at Oak Ridge National Laboratory

机译:橡树岭国家实验室筹备额外议定书实施

获取原文

摘要

The United States Additional Protocol (AP) with the International Atomic Energy Agency (IAEA) entered into force (EIF) January 6, 2009. In anticipation of the EIF, the Department of Energy (DOE) National Nuclear Security Administration Office of International Regimes and Agreements (NA-243) began the initial DOE AP data call on November 3, 2008. This paper describes the Oak Ridge National Laboratory's (ORNL's) preparation, organization, and development efforts to successfully implement the AP and complete the AP data call. ORNL had 35 days to identify declarable activities and finalize the declaration line items (DLIs) for submission to NA-243. To be able to respond within the required time frame, many preparation activities at ORNL were necessary, such as determining the AP coordinator (APC) and team roles; conducting site awareness training; creating the ORNL Standards-Based Management System (SBMS) procedure Reporting of Nuclear Fuel Cycle. Activities; training personnel; and defining site implementation software tools. Identifying, updating, compiling, reviewing, and submitting the DLIs to NA-243 were all critical activities for successfully implementing the AP and completing the AP data call at ORNL.
机译:与国际原子能机构(原子能机构)的其他议定书(AP)于2009年1月6日生效(EIF)。在预期EIF,能源部(DOE)国家核安全管理局国际制度办公室和协议(NA-243)于2008年11月3日开始初始DOE AP数据呼叫。本文介绍了橡树岭国家实验室(ORNL)的准备,组织和开发工作,以成功实施AP并完成AP数据呼叫。 ORNL有35天的时间来确定可否的活动,并最终确定向NA-243提交的声明行项目(DLIS)。为了能够在所需的时间范围内进行响应,ornl的许多准备活动是必要的,例如确定AP协调员(APC)和团队角色;进行网站意识培训;创建基于ORNL标准的管理系统(SBMS)程序报告核燃料循环。活动;培训人员;并定义站点实现软件工具。识别,更新,编译,查看和将DLIS提交到NA-243是成功实现AP的所有关键活动,并在ornl处完成AP数据调用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号