【24h】

AN UPDATE ON THE FARLEIGH EVAPORATORS

机译:关于Farleive蒸发器的更新

获取原文

摘要

THE evaporator stage at Farleigh mill has under-performed in recent years and at times has limited the overall crushing capacity at the factory. The stage was reassessed in the 2007 season in view of the proposed closure of Pleystowe mill in the 2009season and the resulting requirement for increased crushing capacity at Farleigh mill. The assessment of the evaporator stage at Farleigh mill in the 2007 season noted several deficiencies, including the design philosophy of splitting juice to smaller vessels in the same effect through parallel juice flow. Previous measures introduced to monitor the performance of the evaporators and counter imbalances in juice flows to the smaller vessels have fallen into disuse following de-manning of the evaporator stage at Farleigh mill. This paper reports on measures to improve production capacity of the Farleigh evaporator stage during the 2008 season. In particular, the conversion of a juice circuit from parallel to series flow for the fourth effect is evaluatedfor operations during the2008 season.
机译:近年来Farleigh Mill的蒸发器阶段已经在近年来下进行,有时在工厂的整体破碎能力限制了整体破碎能力。鉴于2009年赛中的Pleystowe Mill拟议的填写措施,阶段重新评估了2007赛季的重新评估,并对Farleigh Mill的粉碎能力增加了造成的要求。 2007年赛季法拉利厂对蒸发器阶段的评估注意到了几种缺陷,包括通过平行果汁流动与较小血管分裂到较小血管的设计理念。以前引入监测蒸发器中蒸发器的性能的以前的措施与较小的血管流向较小的血管,在Farleigh Mill的蒸发器阶段去扮演脱落后,脱落。本文报告了在2008赛季期间提高法利蒸发阶段生产能力的措施。特别地,果汁电路与第四次效果平行于串联流的转换是在2008季期间的操作进行评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号