首页> 外文会议>International symposium on geological engineering problems in major construction projects >Stability assessment for the landslide undergoing the effects of water level fluctuation in the Three Gorges Reservoir area, China
【24h】

Stability assessment for the landslide undergoing the effects of water level fluctuation in the Three Gorges Reservoir area, China

机译:稳定性评估山体滑坡正在进行水位波动在中国三峡库区的影响

获取原文

摘要

The Majiagou landslide, as a cause for study, is located on the left side of the Zhaxihe River, a tributary of the Yangtze River. After the water level of the Three Gorges Reservoir rose from 95m to 135m in June 2003, the Majiagou landslide occurred including a 20m- long, 3~5cm wide, (locally 10cmwide) fissure at its back that occurred in a time-frame of 3 months. The implication is, that the reservoir impounding reactivated the landslide. The slide mass of the Majiagou landslide is composed of a thin layer of silty clay on the top with low permeability and a thick layer of angular pebbles as the main portion beneath the silt clay which has high permeability. The rate of water level fluctuation is between 0.6 m/d and 4.0m/d with regard to the altitude between 145 m and 175 m in the reservoir during its normal operational state. Under these conditions, the FEM method was applied to simulate the groundwater changes in the slide mass, coinciding with the reservoir water level fluctuation. The results suggest that the groundwater level almost changes with the reservoir water level simultaneously within the slide mass, which means that the groundwater gradient is very gentle. Therefore, the effect of the reservoir water level fluctuation on the landslide stability is mainly by the action of buoyant force. Without considering dam failure, the seepage force is so little as to be negligible. The stability of the landslide in cases of different water levels is then calculated using the Morgenstern-Price method, and the results show that the factors of safety decrease with the water level rise. As the water level increases to 165m, the factors of safety are at the minimum value, increasing with the water level rise. The minimum value reflects that the landslide is in a critical state, so stabilizing design was applied using stabilizing piles as well as a water drainage system. The project was completed in early 2006, and the water level has risen to 156m in Oct. 2006. Monitoring data illustrated that there is no further deformation of the landslide and the stabilizing piles, so the stabilizing work is effective.
机译:Majiagou Landslide是一名学习的原因,位于Zhaxihe River的左侧,是长江的支流。在2003年6月水平的水位上升到95米至135米后,Majiagou Landslide发生在20米 - 长3〜5cm宽,(局部10℃)的裂缝,在3时框架的时间框架几个月。含义是,储存器抑制重新激活了滑坡。 Majiagou Landslide的滑动质量由顶部的薄层组成,具有低渗透性和厚度的角卵石层,作为淤泥粘土下方的主要部分,其具有高渗透性。在其正常运行状态下,水位波动率在储层中的145米和175米之间的高度之间为0.6 m / d和4.0m / d。在这些条件下,应用有限元方法来模拟滑动质量的地下水变化,与储存水位波动一致。结果表明,地下水位几乎在滑动质量内同时随储层水位变化,这意味着地下水梯度非常温和。因此,储层水位波动对滑坡稳定性的影响主要是浮力的作用。如果不考虑坝体失败,渗流力就会忽略不计。然后使用Morgenstern-Price方法计算不同水位的稳定性在不同水位的情况下,结果表明,水平升高的安全性降低的因素。随着水位增加到165米,安全的因素处于最小值,随着水位上升而增加。最小值反映了滑坡处于临界状态,因此使用稳定桩以及排水系统应用稳定设计。该项目于2006年初完成,水位在2006年10月上升至156米。监测数据说明了滑坡和稳定桩的进一步变形,因此稳定工作是有效的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号