【24h】

1-470 MINE REMEDIATION

机译:1-470矿井修复

获取原文

摘要

The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to 1-470 in Lee's Summit, Missouri. Due to collapse of mined areas near the project site, design included determination of the limits of remediation for the project and minimum construction requirements for mine infilling. The Judy Company, contractor selected for the mine infilling, experimented in the laboratory with several grout mixes to determine the appropriate mix for the project. Infilling was accomplished from the ground surface, and camera observation was used to monitor the barrier wall construction and infilling process. It was discovered that some of the mapped rooms were larger and some were smaller than indicated on the construction plan.
机译:该项目包括填充废弃的地下石灰石矿,以促进密苏里州李峰峰会的新入口坡道到1-470。由于项目现场附近的矿区崩溃,设计包括确定项目的整理限制以及矿井缺陷的最低施工要求。朱迪公司,承包商为矿井infilling选择,在实验室进行了几种灌浆混合物,以确定项目的适当混合。 infilling从地面完成,使用相机观察来监测阻挡壁构造和缺陷过程。有人发现,一些映射的房间较大,部分小于施工计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号