首页> 外文会议>Annual International Coal Preparation Aggregate Processing Exhibition and Conference >FINE COAL RECOVERY PLANT INSTALLATION: SMITH BRANCH IMPOUNDMENT - PINNACLE MINING
【24h】

FINE COAL RECOVERY PLANT INSTALLATION: SMITH BRANCH IMPOUNDMENT - PINNACLE MINING

机译:细煤回收厂房安装:史密斯分支蓄水 - Pinnacle Mining

获取原文

摘要

The sampling and analysis of the Smith Branch Impoundment and the thickener underflow from the Pinnacle preparation plant indicated the economic viability to install a fine coal recovery system at this site. The recovery system has been designed to utilize the latest fine coal technologies available to the industry. The system will incorporate the following advanced technologies; 400HP hydraulic electric dredge, compound spirals, deslime cyclone circuit, column flotation, dewatering chemicals and technologies and paste thickener.
机译:史密斯分支蓄水和脊柱制备工厂的增稠剂溢出的取样和分析表明,在本网站安装精细煤炭回收系统的经济可行性。 恢复系统旨在利用该行业可用的最新煤炭技术。 该系统将包含以下先进技术; 400HP液压电挖水机,复合螺旋,搅拌旋风电路,柱浮选,脱水化学品和技术和粘贴增稠剂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号