EXPANSION OF THE PARDEE PREPARATION PLANT FROM 500 TO 750 T.P.H., THROUGH THE INSTALLATION OF A DENSE MEDIA VESSEL AND DE-SLIME COLUMN FLOTATION CIRCUIT

机译:通过安装密集的介质容器和脱粘柱浮选电路,将Pardee制备厂的扩展从500到750吨。

获取原文

摘要

The paper will review the original 500 t.p.h. Pardee Plant Circuitry (heavy media cyclone 2" X 1mm, spirals 1mm X 100#). The expansion of the plant to 750 t.p.h., due to increased mine production will be discussed, detailing equipment selection and size splits to the various circuits. A heavy media vessel circuit was installed to treat 5" X 1/2" material, with the cyclone circuit processing 1/2" X 1mm in the new plant. A prior upgrade of the spiral circuit (addition of compound spirals) allowed sufficient capacity for the increased plant feed rate. The justification for installation of the de-slime column flotation circuit will be briefly reviewed. Performance of the circuit arid plant throughput rates before and after the upgrade will be discussed. The project scheduling to minimize plant downtime and provide timely increased capacity will be reviewed in detail.
机译:本文将审查原文500 T.H.。 Pardee植物电路(重型媒体旋风2“x 1mm,螺旋1mm x 100#)。将植物扩展到750 TPH,由于矿井生产增加,将设备选择和尺寸分裂到各种电路。一个沉重的安装媒体血管电路以处理5“x 1/2”材料,在新植物中使用旋风电路处理1/2“x 1mm。先前升级螺旋回路(添加复合螺旋)允许足够的植物进料速率容量。将简要介绍安装De-Slime柱浮选电路的理由。将讨论升级之前和之后的电路的性能。将讨论升级之前和之后的吞吐率。将详细审查以最大限度地减少工厂停机时间并提供及时提高容量的项目调度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号