首页> 外文会议>Structures Congress on Structural Engineering and Public Safety >Replacement of the Merchants Bridge Deck Truss Spans
【24h】

Replacement of the Merchants Bridge Deck Truss Spans

机译:更换商家桥甲板桁架跨度

获取原文

摘要

The replacement of the Merchants Bridge deck truss spans was a challenging, yet edifying project. Constructing the new structure while providing uninterrupted access to the existing structure required thoughtful deliberation in how the structure could be realistically designed and constructed. With the ever-aging railroad infrastructure and a high demand for the continued flow of traffic over these structures, it is evident that innovative and creative means of construction are vital to the rehabilitation and replacement of older railroad structures such as the Merchants Bridge. Increasingly congested areas of construction and larger design loads, which tend to require larger foundations, provide opportunities for the consideration of unique design solutions. The use of micropile, the tailored geometry and the atypical construction sequence are a few of those solutions that were utilized for this project. Ongoing communication and teamwork between all parties involved also proved to be a valuable factor in making this project an overall success.
机译:替换商家桥式甲板桁架斯普斯是一个具有挑战性的,但却是一个编辑的项目。构建新结构,同时提供对现有结构的不间断访问,需要深思熟虑的审议,以如何实现结构可以设计和构造。随着较老化的铁路基础设施和对这些结构的持续交通流量的高需求,显然,创新和创造性的建筑工程对康复和更换较旧的铁路结构,例如商人桥梁。越来越拥挤的建筑领域和更大的设计负荷,往往需要更大的基础,为考虑独特的设计解决方案提供机会。使用微米,量身定制的几何和非典型建筑序列是该项目使用的一些解决方案。所涉及的各方之间的持续沟通和团队合作也被证明是使这一项目的一个重要因素是整体成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号