首页> 外文会议>U.S./North American Mine Ventilation Symposium >Integration of strategic ventilation and heat management planning with 3D virtual reality simulation of underground mines
【24h】

Integration of strategic ventilation and heat management planning with 3D virtual reality simulation of underground mines

机译:基于地下矿山3D虚拟现实模拟的战略通风和热管理规划的整合

获取原文

摘要

This paper describes methods employed to integrate strategic ventilation and heat management planning into a virtual reality (VR) simulation tool to enable various scheduling scenarios to be investigated. This can be performed even when infrastructure details are unknown or not yet finalised. The approach taken is to apply conventional activity based determination of ventilation requirements for each stage of the project. In addition, the spatial location of each element of the model, combined with allocated ventilation rates, geothermal properties of the ore body and surface climatic profiles, are used to predict wet and dry bulb temperatures in all intake airways and working locations. Consequently, both the nature of, and schedule for, heat management strategies can be determined.
机译:本文介绍了用于将战略通风和热管理计划集成到虚拟现实(VR)仿真工具中的方法,以实现要调查各种调度方案。即使基础设施细节未知或尚未完成,也可以执行此操作。采取的方法是应用基于常规活动的基于常规活动的项目每个阶段的通风要求。另外,模型的每个元件的空间位置,与分配的通风率相结合,矿体和表面气候谱的地热性质,用于预测所有进气通气道和工作位置的湿和干灯泡温度。因此,可以确定和时间表的性质,可以确定热管理策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号